<center id="h7yn5"><i id="h7yn5"></i></center><blockquote id="h7yn5"><p id="h7yn5"></p></blockquote>

    1. <thead id="h7yn5"><i id="h7yn5"><noscript id="h7yn5"></noscript></i></thead>
            <cite id="h7yn5"></cite>
          1. 夜夜高潮天天爽欧美,k频道国产在线观看,亚洲成人在线,无码国产成人午夜电影在线观看,加勒比中文字幕无码一区,久久99精品久久久久久不卡,久久婷婷激情综合色综合俺也去,成人免费无码大片a毛片软件
            當前位置:首頁   >    產品中心   >    電壓擊穿試驗儀   >    介電擊穿強度試驗儀   >   BDJC-50KV高壓介電強度擊穿試驗儀 產品展示

            高壓介電強度擊穿試驗儀

            型 號BDJC-50KV

            更新時間2024-11-23

            廠商性質生產廠家

            報價

            產品描述:高壓介電強度擊穿試驗儀

            產品概述

            高壓介電強度擊穿試驗儀試驗方式:直流/交流:擊穿試驗、耐壓試驗、階梯試驗
            顯示方式:曲線/數據顯示,數據打印。
            試驗空間:絕緣油/空氣
            升壓速率:0.1KV/S-3KV/S
            整機精度:≤2%

             

             

            高壓介電強度擊穿試驗儀性能特點:
            1、主要由升壓系統、測量系統、A/D轉換器、放電系統、電極、油箱、電極定位架、計算機數據處理系統、軟件等組成;
            2、計算機---A/D轉換器---測量控制系統---調壓裝置---升壓變壓器---試樣;
            3、高壓變壓器主要產生試樣所需的直流電壓;
            4、調壓器用于調節升壓變壓器輸入端電壓以產生高壓所需的輸入電壓;
            5、電壓測量主要是從高壓變壓器測量端測量,高壓變壓器測量端和高壓端是線性的;
            6、放電系統在試驗做完以后放電,以免產生放電對人身的危害;(當試驗結束后,機器部件仍可能存在殘留的高電壓,此殘留電壓足以對人產生致命的傷害,配備此棒,完好的解決此安全隱患)。

             

             

            組成:
            1、升壓部件:由調壓器和高壓變壓器組成0~50KV的升壓部分。
            2、動部件:由步進電機均勻調節調壓器使加給高壓變壓器的電壓變化。
            3、檢測部件:由集成電路組成的測量電路。通過信號線把檢測的模擬信號和開關信號傳給計算機。
            4、計算機軟件:通過智能電路把由檢測設備采集的測控信號傳給計算機。計算機根據采集的信息控制設備運行并處理試驗結果。
            5、試驗電極:根據國家標準(1408.1-2006)隨設備提供三個電極,具體規格為:Ф25mm×25mm兩個;Ф75mm×25mm一個。(訂做除外)

             

             

            性能特點:
            1、主要由升壓系統、測量系統、A/D轉換器、放電系統、電極、油箱、電極定位架、計算機數據處理系統、軟件等組成;
            2、計算機---A/D轉換器---測量控制系統---調壓裝置---升壓變壓器---試樣;
            3、高壓變壓器主要產生試樣所需的直流電壓;
            4、調壓器用于調節升壓變壓器輸入端電壓以產生高壓所需的輸入電壓;
            5、電壓測量主要是從高壓變壓器測量端測量,高壓變壓器測量端和高壓端是線性的;
            6、放電系統在試驗做完以后放電,以免產生放電對人身的危害;(當試驗結束后,機器部件仍可能存在殘留的高電壓,此殘留電壓足以對人產生致命的傷害,配備此棒,完好的解決此安全隱患)。

             

             

             

            整機組成:
            1、升壓部件:由調壓器和高壓變壓器組成0~50KV的升壓部分。
            2、動部件:由步進電機均勻調節調壓器使加給高壓變壓器的電壓變化。
            3、檢測部件:由集成電路組成的測量電路。通過信號線把檢測的模擬信號和開關信號傳給計算機。
            4、計算機軟件:通過智能電路把由檢測設備采集的測控信號傳給計算機。計算機根據采集的信息控制設備運行并處理試驗結果。
            5、試驗電極:根據國家標準(1408.1-2006)隨設備提供三個電極,具體規格為:Ф25mm×25mm兩個;Ф75mm×25mm一個。

             

             

             

            參數
            輸入電壓: 交流 220 V  

            輸出電壓: 交流 0--100 KV ;/直流 0—100 KV


            電器容量: 10KVA   

            高壓分級: 0-100KV  

            升壓速率:0.01-5.0kv(備注:滿足標準要求并可以根據用戶需求設定不同的升壓速率)


            06、試驗方式: 交流試驗/直流試驗:1、勻速升壓   2、梯度升壓 3、耐壓試驗


            試驗介質:空氣,試驗油   安裝靈敏度較高的過電流保護裝置保證試樣擊穿時在0.05S內切斷電源。  儀器配備先進的故障報警系統 避免用戶操作故障儀器發生危險。(上位機報警和下位機報警)

             

             

             

            軟件功能:
            01、軟件平臺:WINDOWS窗口操作平臺,界面直觀,便于操作
            02、曲線顯示:在實驗過程中可以動態顯示試驗曲線
            03、數據導出:可以對試驗結果導入EXCEL表格
            04、實驗報告:可以人為設置報告名稱,并對實驗報告進行打印
            05、試驗方式:可以根據需求對直流試驗和交流試驗進行靈活選擇
            06、試驗方法:可以根據需求自行選擇擊穿電壓、耐壓試驗、梯度試驗
            07、參數設置:可以根據不同的試驗方式及試驗方法靈活設置所需的不同參數值
            08、試樣設置:可對不同標準的試樣參數靈活設置
            09、人員管理:設置用戶名及密碼,不同的操作員登入進行不同的試驗,互不影響
            10、標準選擇:含有不同標準,可根據需求自行選擇
            11、連續操作:連續操作試驗時,可直接在軟件里選擇電機復位,進行二次試驗

             

             

            將介電試驗機的一根試驗引接到作為一個電極的試樣的導體上,并另一根試驗引接到作為另一個電極的金屬試棒上,電壓應從零開始上升至28.1規定的試驗電壓。升壓速度不得超過500V/s如果達到水平無擊穿,電壓應保持在該水平60秒。

             

             

            操作臺要求

            1.試驗電流、電壓(測量線圈和電壓互感器值分別顯示)、時間的實時動態顯示、擊穿瞬間電流、電壓、時間的保持顯示;

            2.合閘、零位、上限、升壓、降壓、恒壓、急停等狀態監控顯示;

            3.操作界面有啟動鈕、停止鈕、急停鈕、高壓指示燈;

            4.有“擊穿”,“耐壓”,“梯度耐壓”選擇開關;

            5.具有“試驗電壓”、“過流閥值”、“升壓速度”、“恒定耐壓時間”、“逐級初始電壓”、“逐級梯度電壓”、“逐級耐壓時間”設置功能;

            6.試驗電壓、電流曲線實時顯示。


             

             

            Test method: dc/ac: breakdown test, compression test, step test
            Display mode: curve/data display, data printing.
            Test space: insulating oil/air
            Pressure rise rate: 0.1 KV/S - 3 KV/S
            High precision: 2% or less

             

             

            Performance characteristics:
            1, mainly by the booster system, measuring system, A/D converter, discharge system, electrode, fuel tanks, electrode positioning, computer data processing system, software, etc;
            2 - A/D converter, computer measurement control system - - - - regulating device step-up transformer - sample;
            3, high voltage transformer is mainly produce samples required dc voltage;
            4, voltage regulator is used to adjust the step-up transformer voltage of the input to generate the input voltage to high voltage;
            5, voltage measurement mainly from high voltage transformer end measurement, high voltage transformer is linear measurement end and high end;
            6 finish after discharge, discharge system in the test, lest produce discharge of bodily harm; (when the experiment ended, the machine parts are still there may be residual high voltage, the residual voltage is enough to cause fatal damage to people, equipped with the rod, solve the potential safety hazard of intact).

             

             

            Composition:
            1, booster parts: consists of a voltage regulator and the high voltage transformer 0 ~ 50 kv booster section.
            2, moving parts: uniform regulation voltage regulator by stepper motor to high voltage transformer voltage change.
            3, test parts: measurement circuit composed of integrated circuit. Through the analog signal and the detection line switch signal to the computer.
            4, computer software, by testing equipment acquisition through inligent circuit of measurement and control signals to the computer. Computer control equipment operation according to the collected information and process the test results.
            5, test electrode: according to the national standard (1408.1-2006) with the equipment to provide three electrodes, specifications are: Ф two 25 mm x 25 mm; Ф a 75 mm x 25 mm. Except (build)

             

             

            Performance characteristics:
            1, mainly by the booster system, measuring system, A/D converter, discharge system, electrode, fuel tanks, electrode positioning, computer data processing system, software, etc;
            2 - A/D converter, computer measurement control system - - - - regulating device step-up transformer - sample;
            3, high voltage transformer is mainly produce samples required dc voltage;
            4, voltage regulator is used to adjust the step-up transformer voltage of the input to generate the input voltage to high voltage;
            5, voltage measurement mainly from high voltage transformer end measurement, high voltage transformer is linear measurement end and high end;
            6 finish after discharge, discharge system in the test, lest produce discharge of bodily harm; (when the experiment ended, the machine parts are still there may be residual high voltage, the residual voltage is enough to cause fatal damage to people, equipped with the rod, solve the potential safety hazard of intact).

             

             

             

            The whole machine:
            1, booster parts: consists of a voltage regulator and the high voltage transformer 0 ~ 50 kv booster section.
            2, moving parts: uniform regulation voltage regulator by stepper motor to high voltage transformer voltage change.
            3, test parts: measurement circuit composed of integrated circuit. Through the analog signal and the detection line switch signal to the computer.
            4, computer software, by testing equipment acquisition through inligent circuit of measurement and control signals to the computer. Computer control equipment operation according to the collected information and process the test results.
            5, test electrode: according to the national standard (1408.1-2006) with the equipment to provide three electrodes, specifications are: Ф two 25 mm x 25 mm; Ф a 75 mm x 25 mm.

             

             

             


            The input voltage: ac 220 V

            Output voltage: communication 0-100 KV; / dc 0-100 KV


            Electric capacity: 10 kva

            High pressure sizing: 0-100 kv

            Pressure rise rate: 0.01 to 5.0 kv (note: meet the standard requirements and can be set according to user requirements different pressure rise rate)


            06, test method: ac/dc test: 1, 2, gradient booster 3 uniform booster, withstand voltage test


            Test medium: air, oil test installation high sensitivity of over current protection device to ensure the sample breakdown within 0.05 S when cut off power supply. The instrument is equipped with advanced fault alarm system Avoid user operation fault instrument. Alarm (the upper machine and lower machine alarm)

             

             

             

            The software functions:
            01, software platform: WINDOWS operating platform, intuitive interface, easy operation
            02, curve shows that: in the process of experiment can dynamically display test curve
            03, data export: can the test results into EXCEL spreadsheet
            04, experimental report: report the name can be set, and the experiment report printing
            05, test mode, can according to demand for flexible choice of dc test and ac test
            06, test method, can according to need to choose the breakdown voltage, compression test, gradient test
            07, parameter setting, can according to different test method and test method for flexible set required different parameter values
            08, sample setting: samples of different standard flexible parameters can be set
            09, personnel management: set the user name and password, different operator login to test different each other
            10, standard options: contain different standards, according to the demand to choose
            11, continuous operation, continuous operation test, can choose motor directly in the software reset, for a second test

             


            Drew dielectric tester of a test of the samples received as an electrode conductor, and the other test lead received as another electrode metal test bar, rose to 28.1 from scratch from voltage should be specified test voltage. Booster speed should not exceed 500 v/s if level and no breakdown, voltage should be kept in the level of 60 seconds.

             

             

            Work station for

            1. The test current, voltage, voltage transformer coil and value respectively display), time of real-time dynamic display, breakdown of instantaneous current, voltage, time keep display;

            2. Switching, zero, ceiling, step-up, step-down, constant pressure and stop condition monitoring display;

            3. The interface has a button, emergency stop button and stop button and high pressure indicator light;

            4. There are "breakdown", "pressure", "gradient pressure" selector switch;

            5. The test voltage, over current threshold ", "booster" speed, "constant pressure time", "initial voltage step by step", "step by step gradient voltage", "graduated compression time setting function;

            6. The test voltage, current curve real-time display.

             

            留言框

            • 產品:

            • 您的單位:

            • 您的姓名:

            • 聯系電話:

            • 常用郵箱:

            • 省份:

            • 詳細地址:

            • 補充說明:

            • 驗證碼:

              請輸入計算結果(填寫阿拉伯數字),如:三加四=7
            聯系人:陳丹
            手機:
            18911395947
            點擊這里給我發消息
             
            主站蜘蛛池模板: 久激情内射婷内射蜜桃| 午夜福利啪啪片| 欧美精品网| 亚州成人AⅤ| 一级做a爰片在线播放| 米奇影院888奇米色99在线| 色一情一乱一伦一区二区三区日本| www.91自拍| 露脸叫床粗话东北少妇| jiZZjiZZ欧美69| 亚洲一码二码三码精华液| 日韩伦理片| 精品视频在线观看免费无码| 把插八插露脸对白内射| 久久一级国产黄色精品| 国产精品久久久久久福利| 国产黄色在线| 精品欧洲av无码一区二区| 熟女爱V| 97无码精品人妻免費一区二区| 欧美牲交a欧美牲交aⅴ一 | 一本无码人妻在中文字幕免费| 曰韩三级无码久久探| 亚洲日韩人妻在线| 欧美精品一产区二产区| 国厂精品114福利电影免费| 在线视频不卡在线亚洲| 国产激爽大片高清在线观看| 亚洲人色婷婷成人网站在线观看| 亚洲第一区欧美国产综合| 巨胸爆乳美女露双奶头挤奶| 日韩综合| 国产偷人妻精品一区二区在线 | 国产愉拍91九色国产愉拍| 秋霞国产在线| 日本理伦片午夜理伦片| 又爽又黄又无遮掩的免费视频| 131mm少妇做爰视频| 青岛市| 国产在线拍揄自揄拍无码视频| 亚洲成人免费网站|